Each project below represents a different challenge, asset class, and grid environment , together they show what Solvyn looks like in the field.
SGA2024001
India's First EMS Deployment
A landmark BESS EMS that redefined renewable storage in India.
BESSEMSIndia1st in India
- Stable power with dynamic load balancing
- Reduced grid dependency, enhanced self-sufficiency
- First-ever EMS deployment in India, new benchmark
Solutions: EMS • Peak Shaving • Fluctuation Control
SGA2024002
Hybrid EMS For Peak Power Management
Stable peak-power delivery across solar, wind, and storage.
BESSEMSIndiaHybrid
- Improved grid stability, reduced output volatility
- Optimised dispatch for higher overall efficiency
- New benchmark for hybrid peak-power management
Solutions: Hybrid EMS • Peak Shaving • Spinning Reserve
SGA2024003
Solar-First Microgrid For Extreme Environments
Renewable-first microgrid delivering reliable power off-grid.
SolarMicrogridOff-Grid
- Significant reduction in diesel consumption and CO₂
- Higher renewable penetration and grid stability
- Seamless automated operations end-to-end
Solutions: MGC • AGC • PPC • SCADA
SGA2024004
Solar-Prioritized EMS For Grid Compliance
Solar-first EMS optimising charging, peak shaving, and compliance.
SolarGrid ComplianceEMS
- Solar-charged storage minimising grid dependency
- Smoothed demand curves via intelligent peak shaving
- Full grid-code compliance with active/reactive control
Solutions: EMS • Peak Shaving • Active/Reactive Control
SGA2024005
Peak Demand Optimisation Through EMS
Aligning solar generation with peak loads to reduce costs.
SolarDemand ResponseEMS
- Lower peak demand charges and reduced energy costs
- Increased solar utilisation, minimal grid dependence
- Flexible load control via automated demand response
Solutions: EMS • Demand Response • Solar Optimisation
SGA2024006
Hybrid EMS For Grid Stability & Ancillary Services
Market-ready flexibility for large-scale hybrid renewable facilities.
HybridAncillaryGrid Stability
- Seamless hybrid integration ensuring grid stability
- Active ancillary market participation with reserves
- Improved reliability via frequency and reactive control
Solutions: Hybrid EMS • Frequency Response • Ancillary Services
SGA2024007
Grid-Scale BESS EMS For ACME Heergarh
End-to-end BESS management across 248 heterogeneous containers.
BESSEMSIndia1st in India
- 30B+ data tags processed daily across 248 containers
- 2.59Mn+ tag values per minute for OEM warranty compliance
- 1.5 days per block, 4 OEM hardware lines unified
Solutions: Solvyn EMS • SCADA • DAM/RTM • LDC Sync
Status: Coming Soon
SGA2024008
PPC For CAISO / SCE Grid Compliance BESS
Single-point BESS controller for SCE and CAISO compliance in California.
InternationalCAISOUSABESS PPC
- 50ms control loop, 30ms POI meter polling
- Full SCE and CAISO EMS setpoint compliance
- Redundant communications with full audit traceability
Solutions: SGA PPC • Honeywell SCADA • CAISO • SCE
Status: Coming Soon
SGA2024009
4-Layer Hybrid EMS Kurnool 405 MW
Beyond the standard hybrid model, 4-layer control architecture.
HybridAURA405 MWIndia
- Plant-level and sub-plant active power scheduling
- Reactive power unification with full CEA compliance
- AURA-driven DAM/RTM revenue optimisation
Solutions: AURA • Hybrid EMS • SCADA • CEA • DSM
Status: Coming Soon